My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009054
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
223
>
3500 - Local Oversight Program
>
PR0545813
>
ARCHIVED REPORTS_XR0009054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 1:58:45 AM
Creation date
7/9/2020 1:22:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009054
RECORD_ID
PR0545813
PE
3528
FACILITY_ID
FA0000713
FACILITY_NAME
RIPONA MARKET
STREET_NUMBER
223
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26106014
CURRENT_STATUS
02
SITE_LOCATION
223 W WASHINGTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 SAFETY IMPLEMENTATION <br /> The provisions of the M J Kloberdanz&Associates Health and Safety Plan are mandatory for all personnel associated <br /> with the site project and operations <br /> A complete background review and site visitation will be conducted in order to deter-none whether specific <br /> amendments are to be made to the Health and Safety Plan based on specific characteristics which may exist on the job <br /> site Any suspected hazards associated with the on-site operation which exposure to, via inhalation or skin absorption, <br /> to such as suspected carcinogens or human stenlants,will be documented and specific guidance will be developed and <br /> added to this Health and Safety Plan as Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site investigations The project site <br /> layout has built-in safety features The site is divided into three zones The following list defines the required personnel <br /> protective equipment <br /> 21 Personnel Protective Equipment(PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the following <br /> protec.tivt.equipment and measures as warrant by the Project Manager <br /> - Coveralls as an undergarment <br /> Saranex outer garment <br /> - Sample gloves(ismer) <br /> - PVC,Nitnle or Neoprene outer gloves <br /> Hard hat <br /> Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges(a combination of organic vapor,acid gas,pesticide, <br /> radionuclide,high efficiency filter) Note that cartridges should be changed daily <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br /> More stringent protective egwpment requirenitnts will be implemented if necessary This determination will <br /> be made by the project supervisor after review of the materials to be handled, the ambient monitoring data, <br /> consultation with on-site technical personnel, the Safety Officer, and the proper management personnel <br /> Upgrades in PPE,if necessary,will be implemented <br /> 22 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety implementations <br /> 23 Daily Safety Meetings <br /> Each day,prior to commencing work, a safety meeting shall be held to discuss safety considerations for the <br /> day's work to be done A safety topic shall be addressed each day from the following list <br /> - Site Safety Plan(first clay and once a week thereafter) <br /> Fire Fighting Techniques <br /> - Defensive Diving <br /> Decontamination <br /> Levels of Protection <br /> - Heat Stress <br /> - Emergency Equipment on Site <br /> - Confined Space Entry Procedure- Respirator Maintenance <br /> Self-contained Breathing Apparatus Training(if necessary) <br /> 24 Safety Log <br /> . A safety log shall be kept for the project work site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.