Laserfiche WebLink
20 SAFETY IMPLEMENTATION <br /> The provisions of the M J Kloberdanz&Associates Health and Safety Plan are mandatory for all personnel associated <br /> with the site project and operations <br /> A complete background review and site visitation will be conducted in order to deter-none whether specific <br /> amendments are to be made to the Health and Safety Plan based on specific characteristics which may exist on the job <br /> site Any suspected hazards associated with the on-site operation which exposure to, via inhalation or skin absorption, <br /> to such as suspected carcinogens or human stenlants,will be documented and specific guidance will be developed and <br /> added to this Health and Safety Plan as Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site investigations The project site <br /> layout has built-in safety features The site is divided into three zones The following list defines the required personnel <br /> protective equipment <br /> 21 Personnel Protective Equipment(PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the following <br /> protec.tivt.equipment and measures as warrant by the Project Manager <br /> - Coveralls as an undergarment <br /> Saranex outer garment <br /> - Sample gloves(ismer) <br /> - PVC,Nitnle or Neoprene outer gloves <br /> Hard hat <br /> Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges(a combination of organic vapor,acid gas,pesticide, <br /> radionuclide,high efficiency filter) Note that cartridges should be changed daily <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br /> More stringent protective egwpment requirenitnts will be implemented if necessary This determination will <br /> be made by the project supervisor after review of the materials to be handled, the ambient monitoring data, <br /> consultation with on-site technical personnel, the Safety Officer, and the proper management personnel <br /> Upgrades in PPE,if necessary,will be implemented <br /> 22 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety implementations <br /> 23 Daily Safety Meetings <br /> Each day,prior to commencing work, a safety meeting shall be held to discuss safety considerations for the <br /> day's work to be done A safety topic shall be addressed each day from the following list <br /> - Site Safety Plan(first clay and once a week thereafter) <br /> Fire Fighting Techniques <br /> - Defensive Diving <br /> Decontamination <br /> Levels of Protection <br /> - Heat Stress <br /> - Emergency Equipment on Site <br /> - Confined Space Entry Procedure- Respirator Maintenance <br /> Self-contained Breathing Apparatus Training(if necessary) <br /> 24 Safety Log <br /> . A safety log shall be kept for the project work site. <br />