Laserfiche WebLink
Groundwater <br /> Flow Direction <br /> N <br /> Process Tanks <br />' and Equipment <br /> HCL Tank <br /> G 11RECEIVING BUILDING <br />' P <br /> Gas Main <br />' — — — — — - — — • . — — Now Process Sewer — <br /> T1 <br /> OND bo ND G O D <br />' Tank <br /> Pit 1 <br /> T2 <br /> do 5,000 eoND fo D <br /> t — --- — — — — — — ---- — — — — 8"Water Main— — — <br /> : WAREHOUSE <br /> LEGEND <br />' a <br /> 0 Tank Sample Location <br /> Scale showing diesel findings --13' <br />' T1 UST Location (Closed) <br /> 0 5 10 Feet <br /> Tank Sample Map Drawn 116j�- <br /> Robert A. Booher Consulting California Cedar Products Date 8115102 Figure 2 <br /> 1340 W Washington Street Reviewed <br /> Stockton, California <br /> Revised <br /> 1 <br />