Laserfiche WebLink
r <br /> Groundwater <br /> Flow Direction <br /> r N <br /> BUILDING <br /> Boller <br /> fi" H P <br /> Gas Main <br /> — — — — — — — — — — — — — — —Process Sewer — <br /> • <br /> HP5 O O Tank •HP3 <br /> Storm Pit 1 <br /> Drain 0 <br /> Q 8"Water Main <br /> O <br /> I <br /> rI <br /> i HPi <br /> r <br /> i <br /> P4 WAREHOUSE <br /> I <br /> I <br /> i <br /> 1 <br /> rI <br /> � HP2 <br /> 1 • <br /> r ' <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> 1 ' <br /> I <br /> r <br /> 1 <br /> ' LEGEND <br /> HP1 <br /> • Proposed Hydropunch <br /> O Soil Sample Location 9112102 <br /> Scale <br /> T1 UST Location (Closed) <br /> o 10 20 Feet �` 23' 100 mg/Kg Diesel Isopleth <br /> at indicated depth below grade <br /> Drawn t4%,Proposal Map <br /> Date 9121/02 Figure s <br /> Robert A. Booher Consulting California Cedar Products <br /> ' 1340 W Washington Street Reviewed <br /> Stockton, Cahfomia <br /> Revised <br /> r <br />