Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 6/3/2020 <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels, 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,-4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring venUtransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> Site Addr n: Fast N Esy#161399 E Yosemite Ave Manteca CA 95336 <br /> : STORE *PrpL;c t <br /> (ARROWS) <br /> Drattil-of <br /> Prp edit D <br /> PV VENTS.. HST - sumpanLDCs. <br /> No vuderlound <br /> . - dtatrtte i• <br /> . iC&lBAt3 vre <br /> . cannot spectats <br /> blue prints. <br /> i 0 F-STOP y' <br /> N <br /> t. <br /> t <br /> . . . . . . r <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . t <br /> . . . .91 .E7 . . . . . . . . . . . . . . <br /> a <br /> L L L <br /> . . . . . . . . . . . . . .i . . . . . . . . . .2 - .wdDIE. <br /> X X X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> O O O . . . . . . . . . . . . . . a+ <br /> . . . . . <br /> P O 5 <br /> x It <br /> V V F <br /> F F <br /> . Az**it T.^und?reround that am not siarhle b the cernf%=9 technician area A=N-NULAR <br /> . pra£>sskttal opinion cab'—dare wkly for io6ennatioml purposes. Drawing oat to F-FILLS <br /> w2le T=TLRBI-NE <br /> P=PROBE <br /> .� Y03-eMITE AVE V=VAPOR <br /> X=SUN IP SENSOR <br /> L=Leak Detector <br /> hi=NIamva; <br /> B=Brine Senior <br /> I=Smart Sensor <br /> S=SIP <br /> C=noata&Chains <br /> Date map was drawn:613,20 E-E Stop <br /> Instructions <br /> If you already have a diagram that shows ail,required informationyou may include-,rather than this page,with your Monitoring System Certification. On your an@ plan, <br /> show tire General layout of tanks and piping. Clearly identify krrabons of the following equipment,if installedmonitoring system control panels;sensors monitoring lank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secei'dary containment areas,mechaeical or electronic fine leak detenors;and in-tank liquid level <br /> probes(if used far leak detection).In the scace provided,note the date this Site Plan was prepared. <br /> LEGEND <br />