My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:34:55 PM
Creation date
7/10/2020 2:17:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transport. Cooling samples will cause condensation of trailer consist of an air compressor, two 150-gallon <br /> moisture within the sample , thereby distorting the laboratory polyethylene tanks , pneumatic pumps , and hoses . <br /> analysis . <br /> The injection hoses are attached to the desired injection <br /> To minimize the potential for cross-contamination between wells via an injection access point. The injection access <br /> air samples , the polyethylene tubing is replaced with new point consists of /z-inch stainless steel tee which screws into <br /> tubing , a coupling attached to the injection well and injection hose. <br /> The coupling is glued to the injection well at least 48 hours <br /> Vapor samples are also subject to the same hold times and prior to the injection even to ensure the PVC glue has time to <br /> must be stored as stated in SOP-10 , properly set and the well elevation is resurveyed . <br /> SOP46 After the injection hoses are attached to the desired wells , <br /> SOIL GAS SAMPLING FROM SOIL VAPOR POINT the trailer-mounted tanks are filled with potable water from <br /> an onsite source . As the tanks fill , the chemical oxidant is <br /> Installation of a soil vapor point may be performed with a mixed into the tank. The amount of oxidant mixed in the <br /> hand auger or truck mounted auger drilling rig . Once the tank is dependent on the desired concentration of the <br /> boring has achieved the desired depth , a 6-inch long slotted solution . After the tanks have been filled , the trailer-mounted <br /> probe , capped on both ends with one end fitted with a air compressor is started and air is supplied to the pneumatic <br /> Swagelok fitting attached to 3/16-inch diameter Nylon tubing pumps . The pneumatic pumps force the solution into the <br /> of desired length is placed in the boring and 12 inches of well through the injection hoses at a maximum of 20 pounds <br /> filter pack placed in the annulus . A layer of dry bentonite per square inch gauge (psig) . The pressure of injection is <br /> powder or chips , followed by a layer of hydrated bentonite , controlled by a valve and can be reduced , if necessary to <br /> and a final layer of dry bentonite powder or chips will be avoid damaging the well and well seal . Additionally, each <br /> placed in the annulus above the filter pack. Excess tubing at injection access point is equipped with a pressure gauge to <br /> the top is coiled and placed in a flush finished well box, monitored the pressure at each injection well individually. <br /> Soil vapor samples will be collected no sooner than one After the total volume of solution has been injected , the <br /> week after probe installation to permit soil vapors to tanks are washed down with potable water to remove any <br /> accumulate within the probe . Soil vapor sampling will occur chemical residue from the tank . The rinsate water is then <br /> after a minimum of five consecutive precipitation-free days injected into the well to clean out the hoses . After the <br /> and after any on site irrigation has ceased , injection activities have terminated , the injection access <br /> points are left on the wells to ensure that pressure in the <br /> The sampling equipment consists of a TedlarT"A bag wells declines to background levels prior to removing the <br /> (available in 1 , 31 5, and 10 liter sizes) , a diaphragm pump , access points and hoses . A pressure relief valve is located <br /> and 3/16-inch-diameter polyethylene tubing (approximately 1 on the access points to relieve any excess pressure above <br /> foot long) . The TedlarTM bag should be fitted with an integral 20 psig , <br /> valve for filling and sealing the bag after sampling . The <br /> diaphragm pump inlet and outlet are fitted with 3/16-inch <br /> hose barbs for attaching the sample tubing . A sample label <br /> with the sample number and date and time of sample <br /> collection is prepared and placed on the TedlarTM' bag . <br /> The sampling procedure requires the end of the tubing from <br /> the probe be connected to the diaphragm pump inlet hose <br /> barb to form an air-tight connection . The sampling pump is <br /> then started and the pump is purged for 1 minute with the <br /> vapor to be sampled . Following purging , the discharge of <br /> the pump is then connected to the TedlarT'" bag using a <br /> section of 3/16-inch tubing . The pump is restarted and the <br /> bag is opened and allowed to fill to approximately 3/4 of its <br /> capacity. Caution should be taken not to overfill the <br /> sampling bag . The sample is placed in a non-refrigerated <br /> dry cooler with sufficient packing to prevent damage during <br /> transport . Cooling samples will cause condensation of <br /> moisture within the sample , thereby distorting the laboratory <br /> analysis . <br /> To minimize the potential for cross-contamination between <br /> air samples , the polyethylene tubing on the discharge side of <br /> the pump is replaced with new tubing . <br /> Vapor samples are also subject to the same hold times and <br /> must be stored as stated in SOP- 10. <br /> SOP-17 <br /> PRESSURIZED SOLUTION INJECTION <br /> For remediation purposes , a portable injection trailer is used <br /> to inject a solution of potable water and a chemical oxidant <br /> suited to remediate contamination at the site . The injection <br />
The URL can be used to link to this page
Your browser does not support the video tag.