Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J — 15100 Thornton ffil Lodi CA 95242 j L, <br /> kill=."%,v .. <br /> LEGEND <br /> 22Dispenser <br /> MAY 0 0 J P=Mon tonna Contra Panel <br /> S=Sensor <br /> SIP= <br /> Turbine Sump <br /> F=Fill Su cket <br /> NMENTAL HEALTH A=Annularpor Sens <br /> ENV I RO M-Annular Sensor <br /> M=Automatic Tank Gage <br /> • DEPARTMENT TS=Transition Sump <br /> L= Leak.Dettfttor— <br /> Pf0au00dLines=............... <br /> . vent Lmes= <br /> Vapor Lines= <br /> \ <br /> CAS=Clean Pir Seperater <br /> V vent lines <br /> .cs • =Emefgenq Shut Off Smtch <br /> V <br /> 11g <br /> DE.� 0=Overfill Harm <br /> ® ,,,,t ti° • Eaamph STPSQ-Turbine,Sensor'Line <br /> • _, �hg Leak Detaor <br /> •® <br /> ss <br /> • I 2)C <br /> Le <br /> • =qb <br /> • Z,6 <br /> • 2p5 <br /> • S <br /> • , d O O O <br /> • ,Ls o O O . <br /> _ TS S o O O o <br /> 3 ^ %ir } a %L <br /> ua <br /> I T • <br /> ESp r 3 • <br /> h <br /> Butl�rnq <br /> r <br /> 1 v z <br /> 74 p= � I • <br /> l� • f b 1 ar <br /> Date map was drawn: 5 /�15 2014 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels-, sensors monitoring tank annular spaces. <br /> sumps, dispenser pans, spill containers, or other secondary containment areas, mechanical or electronic line leak <br /> detectors; and intank liquid level probes (if used for leak detect on) In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page 5 of <br />