Laserfiche WebLink
X. TESTING AND MAINTENANCE Y N NA DATE LAST <br /> PERFORMED <br /> Has the monitoring system certification been completed within the past 12 months? ® ❑ 04-25-2018 <br /> Has the spill container testing been completed within the past 12 months? ® ❑ 04-25-2018 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ❑ ® ❑ <br /> Has the secondary containment testing been completed within the past 36 months? Cg ❑ ® 11-17-2016 <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ ® EXEMPT <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ ® EXEMPT <br /> Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance:VAPOR TESTING ® ❑ - 05-17-2018 <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> XI. FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ❑ (� <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached <br /> XII. DESIGNATED OPERATOR COMMENTS <br /> All answer of N"or NA"in sections Vll through XI must be explained in this section and may require follow-up action. <br /> 1. ST L•2'3 SCA— (PAS ck'Z.'1 (9�6 .Z5,, 0 6 <br /> 2. <br /> 3. <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br /> 10. <br /> 11. <br /> 12. <br />