My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 10:52:09 AM
Creation date
7/10/2020 2:19:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE 09/27/2018 <br /> TIME 09:30 pm-10:30 pm <br /> DURATION 1h <br /> TECHS) J.Blaine <br /> JONES COVEY CROUP, INC. JOB# 14951406 <br /> 9595 Lucas Ranch Road Suite 100 PO# <br /> Rancho Cucamonga, California 91730 <br /> (888) 972-7581 PAYMENT Cash <br /> info@JonesCovey.com <br /> CUSTOMER SERVICE LOCATION j <br /> i <br /> i <br /> Thank you for allowing Janes Covey Group,Inc.to be your <br /> Pilot Flying J-617 Lodi <br /> service partnerl 15100 N.Thornton Road <br /> Lodi,CA 95242 <br /> PO#18196449-6040917. <br /> P1_L23:Disp.24 Sat UDC-Fuel Alarm. 3 <br /> l <br /> 9.28.18—James-After receiving call from Chris O.at PFJ help desk&informing them of the issue with D24S line <br /> causing 123 alarm 1 was advised that they need a technician to inspect issue as status may have changed since <br /> another ASC had performed work on D24S handle hook return issue above ground, potentially resetting shear valve <br /> JOB DETAILS during Service work.While in ratite to site I spoke with GM Joshua&liquid was removed from UDC to get L23 out of i <br /> alar./Also we went over Master shear valve arm orientation.Shear valve had been reset since JCG technician <br /> was on site to test&drain line heaving shear-vatve tripped to-prevent-any-further-alarms-before repairsyouwxLmadm, . <br /> GM JOShUa worked with me&re-tripped D24M shear valve.Primary line pressure no longer pushing fuel into D246 <br /> supply fine. <br /> A rived on site,PO not in kiosk yet. Checked in with manager Joshua. Hooked up test setup&drained fuel from line <br /> again. Made sure to leave UDC completely dry again&made sure Lock Out tag was in place on D24M shear <br /> valve. l will need to send out follow up emails in correspondence to this work order.(Please see Images) 1 <br /> i <br /> Description <br /> CUSTOMER MESSAGE PRE-WORK SIGNATURE POST-WORK SIGNATURE <br /> i <br /> Thank you for allowing ]ones Covey Group, Inc. to be <br /> your service partner! <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.