My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 10:52:09 AM
Creation date
7/10/2020 2:19:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [$ NO [ ] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3. Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done . ( If <br /> addin piping , UDC's , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Tl, T2 T34 T4 ( 87 Fill Sump) : Install ( 1 ) 2 " Ameron Product Entry, ( 1 ) 3 " Ameron Product Entry, & ( 1 ) 3/4" Electrical Entry <br /> T2, T3, T4 (87 STP Sump) - Install (3 ) 2" Ameron Product Entry , ( 1 ) 3/4" Electrical Conduit Entry, & ( 1 ) V Electrical Entry <br /> T5 (91 Fill Sump) - Install ( 1 ) 3/4" Electrical Entry & ( 1 ) 3" Ameron Product Entry <br /> T5 (91 STP Sump) - Install ( 1 ) 2" Flex Product Entry, ( 1 ) 3/4" Electrical Conduit Entry , & ( 1 ) V Electrical Conduit Entry <br /> UDC 7-8, 13, & 16-17 - Install (6) 2" Flex Product Entry, ( 1 ) 2" Ameron Product Entry , & (2) 3/4" Electrical Conduit Entry <br /> *ALL REPAIRS ARE WITHIN SUMP; NO EXCAVATION NECESSARY. WILL PERFORM TESTING AS REQUIRED* <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> ( 17) 2" Flex Product Entries - RLX-2.5 -01 -U <br /> ( 15) 3/4" Electrical Conduit Entries - RF-07-02-U <br /> ( 13 ) 2 " Ameron Product Entries - RF-20L-01 -U <br /> ( 12) 3 " Ameron Product Entries - RF-30L-01 -U <br /> (4) 1 " Electrical Conduit Entries - RF- 10-0-2-U <br />
The URL can be used to link to this page
Your browser does not support the video tag.