My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
400
>
2900 - Site Mitigation Program
>
PR0515480
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 6:29:47 PM
Creation date
7/10/2020 2:31:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515480
PE
2960
FACILITY_ID
FA0012175
FACILITY_NAME
C & L/RYLAND JUCTION
STREET_NUMBER
400
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
400 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Megan Cambridge <br /> Site Mitigation Branch <br /> Department of Health Services <br /> Toxic Substances Control Program <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827-2106 <br /> NOTICE OF INTENT TO PROCEED WITH PRELIMINARY ENDANGERMENT <br /> ASSESSMENT <br /> Dear Ms. Cambridge: <br /> This letter is to inform the Department of Health Services <br /> (Department) of (company name) Is intent to conduct a <br /> Preliminary Endangerment Assessment with respect to the <br /> property known as (site) . This site is <br /> located at (address) California. <br /> It is (company name) Is understanding that upon receipt of this <br /> letter the Department will instruct the State Board of <br /> Equalization to send us a bill for the $7 , 900 fee associated <br /> with the Department ' s oversight of the PEA. It is also <br /> understood that the $7 , 900 fee will entitle (company name) to <br /> 150 hours of Departmental oversight, which may or may not be <br /> adequate to completely assess and/or abate the potential <br /> hazards associated with the site. All billings should be <br /> submitted to (name) at (mailing address) —. <br /> (Company name) ' s proposed schedule for submittals follows: <br /> (Include as appropriate, i . e. , sampling plan, removal workplan, <br /> PEA draft and final reports. ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.