My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1433
>
2900 - Site Mitigation Program
>
PR0545732
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 6:28:08 PM
Creation date
7/10/2020 2:32:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545732
PE
2960
FACILITY_ID
FA0010163
FACILITY_NAME
JAGUAR HEAVEN AUTO DISMANTLERS
STREET_NUMBER
1433
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206-1120
APN
16335002
CURRENT_STATUS
02
SITE_LOCATION
1433 TILLIE LEWIS DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Mr. Stan Oleksy Applied Geotechnology Inc. <br /> USG Corporation <br /> April 17, 1990 <br /> Page 3 <br /> Task 3: Data Evaluation and Report Preparation <br /> Data obtained from a review of existing available information, the field <br /> exploration, and laboratory analyses, will be evaluated in addressing the <br /> following issues: <br /> o Geologic conditions. <br /> o Hydrogeologic conditions during the study period, including water table <br /> maps, groundwater occurrence, and groundwater quality. <br /> The audit results will be prepared in a report summarizing the field <br /> exploration, laboratory testing, and data analyses. This report will also <br /> contain data generated during the study including maps, boring logs, and <br /> well completion diagrams. <br /> SCHEDULE <br /> AGI is prepared to begin field operations upon receipt of your authori- <br /> zation. We estimate that preliminary verbal results will be available <br /> promptly after completion of the field work, with chemical analyses and <br /> final report following approximately 3 to 4 weeks thereafter if standard <br /> analytical turnaround time is used. <br /> Sincerely, <br /> APPLI D GEOTECHNOL INC. <br /> Vincent Lascko P. <br /> Associate Engi eer <br /> RGS/VPL/tag <br /> attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.