Laserfiche WebLink
PQUfN \\ VAN J O A Q U I N Environmental Health Department <br /> . '. COUNTY <br /> Linda Turkatte, REHS , Director <br /> C"9CIFOR�\P Greatness grows here . Kasey Foley, REHS, Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco, REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu, REHS <br /> Michael Kith, REHS <br /> April 26 , 2019 <br /> MEGAN MITCHELL <br /> ELITE IV CONTACTORS <br /> 2535 WIGWAM DR <br /> STOCKTON , CA 95205 <br /> Re : GEORGES BP MINI MART SR0080430 <br /> 18662 N HWY 88 <br /> LOCKEFORD , CA 95237 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the application for a <br /> permit to replace all dispensers with Wayne Ovation Satellite and High Flow dispensers and install Bravo <br /> conversion frames on the underground storage tank ( UST) system at the above noted address . The permit has <br /> been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones . <br /> 3 . Contact Elena Manzo at (209) 953-7699 to arrange the following appointments (a 48-hour notice is <br /> required for inspection appointments) . <br /> Sensor functionality : If a monitoring system cold start is conducted , functionality of the monitoring system must <br /> be verified to ensure that monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code . A copy of the alarm history shall be printed prior to performing the <br /> " cold start" of the monitoring system and made available at the time of EHD inspection . <br /> • Verification of the dispenser footprints contained by the under dispenser containment sumps , ( UDCs) <br /> • Verification of the Bravo conversion frames installation per manufacturer' s installation instructions ; <br /> completed Bravo conversion frame order forms must be present at the time of inspection . <br /> • Visual inspection of the piping within the dispensers ( in operating condition ) <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection and approval . <br /> 4 . If concrete will be broken near the tank , a secondary containment test must be performed on the <br /> tank once concrete is poured in accordance with the manufacturer's guidelines . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjcehd . com <br />