Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Test ❑ Repair Test Z 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10182157 1 / 14/20 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> KOMAL BROS TIGER EXPRESS <br /> Business Site Address City ZIP Code <br /> 5777 FRENCH CAMP RD STOCKTON 95231 <br /> Il . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Edward Stearns (209 ) 744-0112 <br /> Contractor I Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex . 9/30/20 8883080- UT 11 /9/2020 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> Franklin Fueling - EBW & Phil Tite # 1009893708 Ex . 11 /29/2020 <br /> OPW # 104-635 Ex . 3/14/2020 <br /> 111 . SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : ❑x Manufacturer Guidelines (Specify): LAKE TEST <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> # of <br /> Attach the testing procedures and all documentation required to determine the results. Attached Pages <br /> TANK ID : (By tank number, stored product, etc.) 87 91 DSL-S DSL-N <br /> Spill Container Manufacturer: OPW OPW OPW OPW <br /> Method of Cathodic Protection : x❑ Non-Metallic ❑x Non-Metallic N Non-Metallic ❑x Non-Metallic <br /> ❑ Isolation ❑ Isolation ❑ Isolation ❑ Isolation <br /> ❑ Other (Specify in V.) ❑ Other (Specifyin V.) ❑ Other (Specifyin V) ❑ Other (Specify in V) <br /> Inside Diameter of Spill Container: (Inches) 11 11 11 11 <br /> Depth of Spill Container: (Inches) 12 14 13 13 <br /> Does the spill container have a 5 gallon capacity? ❑x Yes ❑ No R Yes ❑ No 0 Yes ❑ No R Yes ❑ No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve 0 Drain Valve XI Drain Valve 0 Drain Valve <br /> ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br /> ❑ Other (Specify in V.) ❑ Other (Specify in V) ❑ Other (Specify in V.) ❑ Other (Specify in V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results : 0 Pass ❑ Fail 9 Pass ❑ Fail 9 Pass ❑ Fail TLE Pass OF ail <br /> V. COMMENTS <br /> Any items marked "Fail" above must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations , Title 23, Division 3 , <br /> Chapter 16, Section 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> if the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council <br />