My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1701
>
3500 - Local Oversight Program
>
PR0545816
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:32:15 PM
Creation date
7/15/2020 1:11:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545816
PE
3528
FACILITY_ID
FA0005133
FACILITY_NAME
CITY OF STOCKTON ENGINE CO #1*
STREET_NUMBER
1701
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14510002
CURRENT_STATUS
02
SITE_LOCATION
1701 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> a <br /> City of Stockton A68106.OIA <br /> May 29, 1996 Page B-3 <br /> t <br /> B-5 Personal Protective Equipment: It is anticipated that the level of personal protection <br /> required for this project will be U.S. EPA Level D r modified Level C. Personal protective <br /> equipment for each member of the field team will be available on-site and used as may be <br /> required by field conditions. A summary of the personal protective equipment is as follows: <br /> • Full or half face respirators equipped with organic vapor cartridges; <br /> �t <br /> • Tyvek® coveralls; <br /> • Neoprene rubber gloves; <br /> • Steel-toed leather work boots or steel-toed rubber boots; <br /> II • Safety glasses; and <br /> • Hardhats. <br /> Hardhats will be worn at all times. Goggles will bc worn during steam cleaning operations. <br /> 1 ' If required, the remaining personal protective equipment shall be put on before entering the <br /> immediate work area. The sleeves of the coveralls shall be outside of the cuffs of the gloves <br /> to facilitate removal of clothing. If at any time protective clothing (coverall, boots or gloves) <br /> becomes torn, wet, or excessively soiled, they will be replaced immediately. <br /> No eating, drinking or smoking will be allowed int e vicinity of the operations. The project <br /> 4 geologist will designate a separate area on-site for eating and drinking. Smoking will not <br /> be allowed at the facility except in designated areas. No contact lenses will be worn by field <br /> tpersonnel. <br /> B-6 Cleanup/Decontamination Procedures.: At the end of the workday, the following <br /> procedures will be used to allow for the safe removal and decontamination of personal <br /> protective equipment that may have been required. <br /> • Boots and gloves will be washed with a conox® detergent and tap water, then <br /> rinsed before removal. <br /> • Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br /> appropriate disposal. <br /> k <br /> t • Gloves will then be removed and placed int e plastic bag; hands will be washed with <br /> soap and water. <br /> • Spent protective clothing will be storedon-site in 55-gallon drums and properly <br /> disposed of after receipt of laboratory analyses. <br /> F, <br /> �i <br />
The URL can be used to link to this page
Your browser does not support the video tag.