My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gregory P.Fletcher � Qcio- CO <br /> Environmental Coordinator <br /> TR 3038 <br /> 913/293-568 _ <br /> Marketing Conoco Inc. <br /> North America Box4784J U L <br /> Hou <br /> July 3, 1991 MIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Ms. Laurie Cotulla <br /> San Joaquin County Public Health Service <br /> Environmental Health Division <br /> P.O. Box 2009 <br /> Stockton, California <br /> Re: February, March 1991 Quarterly Status Report <br /> 4325 East Washington Street <br /> Stockton, California 95201 <br /> Dear Ms. Cotulla: <br /> Please find enclosed for your review the quarterly status report on the operation of the <br /> soil vapor extraction system during February and March, 1991. 2,500 pounds (400 <br /> gallons) of gasoline have been extracted during those two months. A total of 24,700 <br /> pounds (4000 gallons) of hydrocarbons have been removed to date. <br /> A well installation workplan is currently being prepared to install additional ground <br /> water monitoring wells and soil vapor extraction wells. The report should be submitted <br /> to your office for approval within four weeks. <br /> Should you have any questions, please contact me at 713/293-5683. <br /> Sincerely, <br /> Gregory P. Fletcher <br /> Coordinator - Environmental Affairs <br /> GPF/lmm <br /> enc <br /> cc: California Regional Water Quality Control Board Elinore Ratlith <br /> Central Valley Region San Joaquin Co. <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br />
The URL can be used to link to this page
Your browser does not support the video tag.