My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ DuPont Biosysten <br /> f <br /> TABLE A <br /> APPLICATION DETAILS I. <br /> 1. Equipment Location Drawing - See attached Site Plan <br /> 2. Description of Equipment - The pilot program will use a <br /> 1 1/2 hp oil recovery system vacuum pump (electric and <br /> explosion proof) , Model #1132007. The final system will <br /> depend on the pilot program. <br /> 3. Description of Operation - See text. <br /> 4 . Operation Schedule - <br /> Pilot Program: 24 hr/day for 30 days j <br /> Full Scale: Depends on pilot program <br /> 5. Process Weights - Will depend on pilot program. <br /> 6. Fields and Burners Used - Electric unit for pilot <br /> program. Hydrocarbon fuel or possible propane for full <br /> scale equipment. <br /> 7 . Flow Diagram - See attached Pilot Vapor Extraction <br /> diagram. <br /> 8 . Drawings of Equipment - Commercial equipment drawings can <br /> be provided after the pilot program when the specific <br /> equipment is selected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.