Laserfiche WebLink
oUPO MEW I <br /> R0UNDWATER <br /> u*�sNco� <br /> Im RIO REMEDIATIO_ N <br /> E. I. DU PONT DE NEmouRs & COMPANY S E R V 1 C µ E S <br /> �co ►o..no <br /> WILMINGTON. DELAWARE 19898 L_. <br /> CHEMICALS AND PIGMENTS DEPARTMENT <br /> BARLEY MILL PLAZA <br /> February 4, 1988 <br /> Mr. Gary Johnson <br /> Environmental Affairs <br /> California Regional Water Quality <br /> Control Board <br /> Central Valley Region <br /> 3443 . Routier Road <br /> Sacramento, CA 95827--3098 <br /> Dear Mr. Johnson: <br /> This letter outlines -Du Pont's c rrent plans for aquifer testing <br /> at Kayo's 4325 Washington St, Stockto , CA site. <br /> The zone to be tested is the first water-bearing horizon. It <br /> consists of sands and silty sands, and is from 25- 62' below the <br /> surface. There may be a partial clay barrier at 50' below surface. <br /> Currently the water table is at 471 , so the zone is unconfined and <br /> contains 15' of water. This zone contains the great Majority of the <br /> gasoline contamination at the site. <br /> The aquifer testing will begin Fiday, February 5th: The <br /> testing will be conducted by Groundwa er Technology Inc. Du Pont's <br /> hydrologist, Dr. Calvin Chien, will b present from the 10th through <br /> the 13th to direct testing. A steppe drawdown test of well MW-14 <br /> Will be conducted on the 5th to estim to well efficiency and <br /> determine the proper pumping rate for the drawdown test itself. The <br /> sustained pumping test will begin on the morning of the 10th. Well <br /> MW-14 will be pumped. The water levels in three well points and in <br /> wells MW-9 , MW-10, and MW-11 will be monitored and recorded using <br /> Pressure transducers and a data logger . <br /> The insertion of well points will begin Monday, February 8th. <br /> Each well point will be inserted to a depth of 601 , and equipped with <br /> either a 10 ' or 15' screen at the bottom. One well point will be <br /> inserted 10' west of well MW-14 , just outside of the canopy. A <br /> second will be inserted 15' to the southeast. The third will be <br /> inserted 20' northeast of MW-14 . The well points will be installed <br /> by Du Pont's subcontractor Haliburton Industrial Services, using a <br /> water jet drilling method. We plan to remove the well <br /> following completion of the aquifer testing. Paints <br /> I <br /> i:- <br />