Laserfiche WebLink
E- -Ell MM1M-- <br /> r' <br /> Page 6 <br /> July 12, 1991 <br /> Y Joh No,400511-1:1 <br /> or grout to the toll of the clay layer. "fho ntonitaring well will he completed in the <br /> portion of the saturated zone overlying the clay layer. <br /> The monitoring wells will he constructed 0f2-inch diameter flush-threaded,Schedule 44 <br /> PVC well casing and screen. Well screen with a slot size of 0.02-inc:t will he utilized in <br /> the well construction and the annular space surrounding the well,Screen will he backfilled <br /> to approximately 2 feet above the top of the screened section using L,onestar No. 2/12 <br /> sand. Figure 4,Proposed Monitar ing Well Detail,providesadditionaI information on the <br /> construction of the proposed ground-water monitoring wells. <br /> • Drill, log, and install nineteen (19) vapor wells at the locations shown on Figure 3. <br /> Complete the borings as 2-inch diameter wells. 'ilte wells will be ;jstalled as six (6) <br /> f clusters of three(3)with each well cluster having wells to approximate depths of 90 feet, <br /> 65 feet,and 40 feet below grade. One additional shallow vapor well will be installed next <br /> to RW-25 with an approximate depth of 40 feet. Figure 5, Proposed Vapor Well Detail, <br /> provides additional information on the construction of the proposed vapor wells. <br /> Screened intervals for the wells will be determined by the field geologist based on the <br /> s#ratigraphy of the subsurface. The deepest Wel!in each 3-well cluster shall be drilled first <br /> to establish the stragigraphy and the screen intervals for all wells to that cluster. <br /> E Develop the proposed monitoring wells and measure the depths to ground Witter and <br /> apparent free product, if any, in :tll of the wells present at the site. <br /> • Survey the elevations and locations of the newly installed wells. The well elevations will <br /> he surveyed relative to Mean Sea Level. <br /> F = <br /> i r Collect ground-water samples from each monitoring well at the site which does not <br /> contain a measurable thickness of free-float'snz.product. These ground-water samples will <br /> be analyzed for total petroleum hydrocarbons as gasoline(TPI-1g),benzene,ethylbenzene, <br /> toluene,and xylenea. <br /> • Once the wells are installed,DERS will pipe the vapor extraction wells to the equipment <br /> area and manifold the well headers. Construction of the manifold will allow each vapor <br /> well to be used as either an extraction well, or an induction well. Upon receiving the <br /> necessary air permit modification approval,the wells will he incorporated into the existing <br /> vapor extraction system(VES). . <br /> �+ DU PONT ENVIKO\htENTAL 12t.-,tE[)tA1ION SE.RVIt LS <br />