My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012650
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0012650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 9:48:20 PM
Creation date
7/15/2020 1:41:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012650
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> STANDARD OPERATING PROCEDURES <br /> No. 1403 <br /> TITLE: Soil Sampling Using a Split-Barrel Sampler <br /> PURPOSE: This SOP is designed to provide guidelines for the collection of soil same:,%:using a split- <br /> barrel sampler. Potential hazards are addressed in the attached Jo', Sarety Analysis <br /> (JSA). <br /> r"a <br /> NECESSARY EQUIPMENT: <br /> Split-Barrel Sampler <br /> t <br /> 6-inch Long Brass or Stainless Steel Sample Liners <br /> End-Caps <br /> t Aluminum Foil <br /> Electrical Tape <br /> Permanent Marker <br /> Ice Chest and Ice <br /> F.ID/PID Meter <br /> Sample Container Labels <br /> WORK SAFELY... READ THE JOB SAFETY ANALYSIS <br /> I. <br /> PROCEDURES: <br /> r-s <br /> 1. Be aware of Safety. Don appropriate.PPE,as prescribed by the DERS Health and Safety Plan <br /> discussed in this workplan. <br /> f2. Disassemble the sampler and place 3 decontam;nated 6-inch br ass or stainless steel liners into <br /> the sampler. Reassemble the split-spoon sampler. <br /> 1,G 3. Spe SOP 5200 for procedures on Hollow-Stem Auger Drilling. The following steps are <br /> performed at step 9 of SOP 5200. <br /> 4. Attach the split-barrel sampler to the center rods of the hollow-stem auger drill rig and lower <br /> the sampler to the bottom of the bore hole. <br /> 5. Attach the drill rig drive hammer to the center rods. <br /> G. Using a specified drop height,drive the sampler into the undisturbed soil immediately beneath <br /> I the bottom-most auger flight. Drive the sampler in 18 inches or until it no longer can be driven <br /> t in. Record the number of blows it takes to drive the sampler in every G inches. <br /> 7. Detach the hammer and attach the center rods to the hanger a: ;mbly. <br /> re <br /> -A-1 - <br /> -tat <br />
The URL can be used to link to this page
Your browser does not support the video tag.