My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012650
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0012650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 9:48:20 PM
Creation date
7/15/2020 1:41:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012650
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�p <br /> r.t <br /> E•f. Notation of any evident mineralogy, <br /> !" tr•g. Notation of the presence of roots, other organic material, or fill material. <br /> 7, Soil hue should be described when the soil is wet or saturated. If the soil is dry, moisten it. <br /> 8. If the sample was obtained from a split-barrel sampler, the consistency(for fine-grained soils) <br /> or density(for coarse-grained soils)should be determined from blow-count data,and recorded <br /> on the log sheet. American Society far Testing Materials standards should be used. <br /> 9. ff a sample from a given depth is missed, the reason should be noted on the log and another <br /> sample from as close a depth as possible in the same hole should be obtained. <br /> i <br /> 10. At the completion of logging the following should be performed: <br /> r.: <br /> 10.a. Recheck the field notes, log,and site description. <br /> 10.b. Writc a short job summary. <br /> F`s <br /> QA/QC: <br /> Proper quality'ssurance during lithologic logging will be achieved if adequate time is taken to properly <br /> characterize the sample (do not rush). If more than on. field geologist is present, quality control can <br /> F. be achieved by consultation between the geologists. <br /> REFERENCES: <br /> c�, A <br /> (, Written: 12-5-90 <br /> r: <br /> i.4 <br /> 1 <br /> i <br /> f . <br /> l--4 <br /> 4' <br /> A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.