Laserfiche WebLink
a <br /> Conoco, Inc,, East Washington Street, Stockton, California SECOR Project No. <br /> I. GENERAL SITE REQUIREMENTS AND BACKGROUND INFORMATION AN <br /> A. Health and Safety Plan Responsibilities <br /> e Prior to beginning onsite work, the Project Manager will ensure Attachments <br /> 1 and 2 are completed. <br /> The Site Health and Safety Officer (SHSO) will implement the Plan The <br /> SHSO has the authority to stop work or prohibit any personnel from working <br /> on the Site at any time for not complying with any aspect of the Plan <br /> • Each person on the Site has responsibility for their own health and safety, as <br /> well as assisting others in carrying out the Plan Any person observed to be <br /> in violation of the Plan should be assisted in complying with the Plan, or <br /> reported to the Site Health and Safety Officer <br /> • Any Site personnel may shut down field activities if there is a real or <br /> perceived immediate danger to life or health <br /> B. Minimum Training and Medical Surveillance Requirements for Site Personnel <br /> • 40 hr. Health and Safety Training for hazardous waste workers <br /> e 8 hr Annual Refresher Training <br /> Respirator Fit Testing <br /> a Medical Surveillance <br /> . _ Tw _ <br /> - - - _ - -C,---=Initial Site Enhy-Has-this been performed by_SECOR9 (YES/NO) YES If YE , <br /> describe. <br /> The <br /> D. Purpose of Field Work: <br /> Operaum-and maintenance of the exlsting_s�������� <br /> s9undmg, anti sam <br /> E. Detailed Description of Specific Tasks Planned <br /> NOTE: Specific operation and maintenance procedures are described in the <br /> Operation and Maintenance Manual. This Health and Safety Plan will be kept with <br /> the Operation and Maintenance Manual in the lock box located within the Treatment <br /> Compound at all times <br /> f Iconocoletocktvnlh&slatockton o&m 12118!95 <br />