My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008756
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0008756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:34:06 PM
Creation date
7/15/2020 1:50:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008756
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Linda S Thompson <br /> Project Coordinator ® �® <br /> Room PO-3038 <br /> 7131293-2867 <br /> Remediation Technology Conoco Inc ' f'1 II 11 U HEALTH <br /> A LTH <br /> Fax 713/293-3305 P O Box 4784 i {tiC ��(CE <br /> Houston, TX 77210-4784 <br /> 93 NOV -9 PH 1: 05 <br /> November 4, 1993 <br /> Mr Harlan Knoll <br /> San Joaquin County PHSIEHD <br /> P O Box 2009 <br /> Stockton, California 95201 <br /> RE: Quarterly Monitoring Report, Soil Remediation System, 3rd Quarter 1993 <br /> 4325 East Washington Street <br /> Stockton, California 95201 <br /> Dear Mr Knoll <br /> Please find enclosed for your review the quarterly status report on the operation of the soil <br /> vapor extraction system during the third quarter of 1993 Approximately 702 pounds (114 <br /> gallons) of gasoline have been extracted during the most current reporting period A total <br /> of approximately 95,800 pounds (15,500 gallons) of hydrocarbons have been removed to <br /> date The operating efficiency (actual operating time versus the total time in the reporting <br /> period) of the system was 96% <br /> This report represents the final "soil only" quarterly report Future quarterly reports will <br /> provide a consolidation of soil and groundwater information The first, second and fourth <br /> quarter reports will contain soil remediation information consistent with this report and <br /> general information regarding the groundwater treatment system, such as downtime or <br /> operating anomalies The third quarter report will contain soil remediation and annual <br /> groundwater monitoring data <br /> Should you have any questions or comments, please contact me at 713/293-2867 <br /> Sincerely, <br /> Linda S Thompson <br /> Project Coordinator <br /> enc <br /> cc Ms Beth Thayer Mr Fred Cruz <br /> w/enc CA RWQCB-Central Valley Region San Joaquin County APCD <br /> 3443 Routier Road, Suite A 4230 Kiernan Ave , Suite 130 <br /> Sacramento, CA 95827-3098 Modesto, CA 95356 <br />
The URL can be used to link to this page
Your browser does not support the video tag.