My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008757
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0008757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:56:57 PM
Creation date
7/15/2020 1:50:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008757
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> 1 October 11, 1993 <br /> Job No 93036 <br /> 1 <br />' Conoco, Inc <br /> Room PO - 3038 <br /> P O. Box 4784 <br />' Houston, TX 77210-4784 <br /> ATTENTION Ms Linda Thompson <br />' Project Coordinator - Remediation Technology <br /> SUBJECT. Quarterly Groundwater Monitoring Report <br />' July - September, 1993 <br /> Former Econo Gas Station <br /> 4325 East Washington Street <br /> 6Stockton, California <br />' Dear Ms. Thompson <br /> 1.0 INTRODUCTION <br />' This report presents the results of the quarterly groundwater sampling which was conducted at Conoco <br /> Inc 's (Conoco) former Econo Gas Station, located at 4325 East Washington Street, Stockton, California <br />' (see the Location Map, Figure 1) on August 19, 1993 The purpose of this sampling program is to <br /> monitor and evaluate the extent of hydrocarbon contamination in the groundwater at the site Sampling <br /> observations and analytical results are reported herein from October 1991 through the current quarter <br /> Sunriver Engineering and Construction assumed responsibility for the monitoring of this site in June <br /> 1993 <br /> 2.0 GROUNDWATER SAMPLING SUMMARY <br /> 2.1 Summary of Groundwater Elevation Data <br /> A summary of data regarding ground water levels through August 19, 1993 is presented in Table A <br /> IIn general, groundwater levels at the subject site have risen approximately 0 40 foot since the last <br /> quarterly sampling event The groundwater gradient at the site is generally directed toward the south <br /> at a magnitude of approximately 0 0007 foot per foot (see the Groundwater Gradient Map, Figure 2) <br /> CONOCO\93036V�[JA.H2O2 REY <br /> • <br /> Engineering and COnSt�'l.1GtI0t�, Inc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.