Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): G<< <br /> Q 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; E 3.TELEPHONE; <br /> ❑4.PAGERS; F215.ALARM SYSTEM; 0 6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): ML <br /> [J 1.VERBAL WARNINGS, ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; []3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: Winston Deason C13- <br /> PRIMARY EMERGENCY COORDINATOR NAME: Winston Deason PHONE NO.: (209) 304-5512 PHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Miguel Magdaleno PHONE NO.: (209)636-7918 PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the Tplicable boxes to indicate your facility's procedures for containing sills and preventing and miti aking releases,fires andlor ex losions. <br /> Di. <br /> Q 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.: <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> [j]3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> R 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> [�8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> [� <br /> 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> Q 1.1.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> Q 1.2,NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> Fol 13,ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> [:114,PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> 0 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> M 16.141RE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> T IT USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> f--1 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> 0 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> Fo�k 20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> nz. <br /> ❑21.OTHER(Specify): <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply)_ �1 <br /> ❑ 1. BELLS; <br /> ❑2. HORNS/SIRENS; <br /> 213, VERBAL(i.e.,Shouting); <br /> []4. OTHER(Specify): ]Daily job briefings and Muster point. <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): F' <br /> Muster point sign in parking lot. <br /> Nate:The Emergency Coordinator must account for ail onsite em to ees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: na. <br /> 0 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑. 2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): PS. <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): r i. <br /> ❑o 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> F12. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): rz. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan, <br /> Rev.03/07/17 Page 2 of 4 <br />