My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008766
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0008766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:16:31 PM
Creation date
7/15/2020 1:53:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008766
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. DU PONT ENVIRONMENTAL REMEDIATION SERVICES <br /> 7068 Koll Center Parkway, Suite 401 <br /> Pleasanton, CA 94566 <br /> (510) 462-7772 <br /> Fax (510) 462-7944 October 5, 1992 <br /> RECEIVED Job No 0511-30-6090-04 <br /> m 1 3 92 <br /> Conoco Inc _ENTAL Aff AM <br /> 600 North Daisy Ashford <br /> MO 3018 <br /> Houston, Texas 77079 <br /> ATTENTION Mr Gregory P Fletcher DEC <br /> Senior Coordinator - Environmental Affairs EIVVIPC 2 9 Pg92 <br /> L HEALTH <br /> SUBJECT Quarterly Monitoring Report PEf?M)J� r. CES <br /> A <br /> July - September 1992 C�$ <br /> Former Econo Gas Station <br /> 4325 East Washington Street <br /> Stockton, California <br /> Dear Mr Fletcher <br /> This report resents the status of the soil remediation system located at Conoco Inc's Conoco <br /> P P Y (Conoco) <br /> former Econo Gas Station, 4325 East Washington Street, Stockton, California between July 1992 <br /> and September 1992 A Du Pont Environmental Remediation Services (DERS) technician visited <br /> the site on a weekly basis Typical activities that were performed during a visit included equipment <br /> inspection, instrument calibration, influent and effluent soil vent gas concentration measurements, <br /> and control system adjustments A hand-held organic vapor analyzer (OVA) was used by the <br /> technician to measure the vent gas hydrocarbon concentrations Monthly influent soil vent gas <br /> samples were collected for laboratory analyses DERS maintained a site visit sign-in log The log <br /> is available for inspection upon request Laboratory results and cham-of-custody forms are attached <br /> in Appendix A <br /> The soil remediation system consists of a series of vapor wells, a vacuum extraction blower, and a <br /> thermal incinerator The extraction rate of the soil remediation system is approximately 105 <br /> standard cubic feet per minute The operating efficiency (actual operating time versus the total <br /> time in the reporting period) of the, system was 98 percent The system was down on August 24, <br /> September 4, and September 6, 1992 In each case the system was shut down due to preventive <br /> maintenance and testing for well optimization The system was checked and restarted each time <br /> when no mechanical deficiencies were noted <br /> Better Things For Better living <br /> 4511 12 Rev 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.