Laserfiche WebLink
Page 2 - <br /> January 30, 1992 <br /> Job No 400511-SA <br /> In 1985, it was discovered by Kayo Oil Company that the station's underground tanks were apparently <br /> leaking gasoline The station has been out of service since 1985 The station's underground storage <br /> tanks were removed in 1987 <br /> -The-initial-drilling program at-the site-was-performed-by-IT—Corporation-on February-27;-1985 to ----- ' <br /> provide basic subsurface soil and hydrogeologic information Four boreholes (DH-1, DH-2,DH-3, and <br /> DH-4) were drilled and backfilled in this initial phase of investigation Their study reported the soil ' <br /> contained benzene at levels as high as 160,000 parts per billion (ppb) in the area of VW-32 A second <br /> drilling program was performed by Tr Corporation on March 26 and 29, 1985, the objective of which <br /> was to determine the extent of the hydrocarbon plume discovered in the initial drilling phase Four ' <br /> vadose zone monitoring wells(MW-1, MW-2, MW-3, and MW-4)were drilled and installed at that tune <br /> to a depth of 20 feet On May 29, 1985, IT Corporation conducted its third drilling phase to install 1 <br /> three wells (MW-5, MW-6; and MW-7) to the groundwater table to determine if the groundwater had <br /> been contaminated and to determine the direction of groundwater flow <br /> Four additional monitoring wells were installed at the site from <br /> (MW-8� MW-9, MW-10, and MW-I1) <br /> September'18 through 20, 1985 These wells were installed by the Twining Laboratories, Inc as a <br /> subcontractor of Fox Environmental.Services, Inc The purpose of these wells was to further define the <br /> extent of soil contamination and assess the groundwater conditions Soil and groundwater samples were <br /> collected and the results presented in numerous reports by Fox Environmental Services and the Twining <br /> Laboratories <br /> Groundwater Technology Inc drilled and installed groundwater monitoring wells MW-12 and MW-14 <br /> through MW-23 during a four month period of tune from October 1987 through January 1988 These <br /> wells ranged in depth from 50 to 66 feet Monitoring wells MW-12, MW-17, MW-19, MW-20, MW-21, <br /> and MW-22 were installed as off-site wells <br /> Du Pont Biosystems installed three groundwater remediation wells (RW-24, RW-25, and RW-26) on f <br /> September 26 through 29,'1988 The first two-of these wells were completed to a depth of 69 feet,the <br /> third well was completed to a depth of 64 feet Soil samples from these wells were collected and <br /> analyzed and the results are presented in the report entitled"Quarterly Ground-Water Sampling Report <br /> and Additional Well Installation, November 1988, former Econo Gas Station, 4325 East Washington <br /> Street, Stockton, California,"-dated February-9, 1989 _ This study reported the-soil contained TPHg at <br /> levels as high as 33,000 milligrams per kilogram (mg/kg) in RW-25, 430 mg/kg in RW-24, and 152 <br /> mg/kg in RW-26 <br /> 4005111 Rev 1 Du Pont Environmental Remedlatton Services <br /> Pnnted on Recycled Paper <br />