My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
3500 - Local Oversight Program
>
PR0545835
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 9:44:55 PM
Creation date
7/15/2020 1:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545835
PE
3528
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
02
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to <br /> BACKFILL EXCAVATION CER'T'IFICATE <br /> Project Location 2512 i <br /> Owner— Mr. Heng Chea Phone No.(2 09) 463 x114 <br /> E <br /> Contractor James J. Hoblitzell Phone Nn. 209 943 7793 License No.365234 "A"Haz <br /> INDICATE METHOD OF BACKFILL QUALITY;ASSURANCE <br /> i <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days ofproject completion, or <br /> X 2. Submission of verification, a g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation to 12" lifts: I <br /> X A. Pea gravel--smooth, rounded material not more than oae-half'(1R) inch in diameter <br /> XOIL <br /> .� B. Crushed rock--self-compacting material not more than ll three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfilI if contact will be made betw6en <br /> the backfill material and tanks/pipes made of poly res&glass or similar materials.) <br /> DECLARATION <br />! If <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 dayyss of roject completion,or submission <br /> of verification that the select material described above will be placed at a minimums of five(5 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. .I <br /> * James J. Hoblitzell , <br /> Name (Print)'. <br /> Contractor <br /> lie (Print) <br /> ji <br /> tgnatllre <br /> s <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> 11 <br /> �I <br /> l <br /> i} <br />
The URL can be used to link to this page
Your browser does not support the video tag.