My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
599
>
2200 - Hazardous Waste Program
>
PR0536066
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:35:58 PM
Creation date
7/15/2020 2:18:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0536066
PE
2247
FACILITY_ID
FA0018556
FACILITY_NAME
RITE AID #6490
STREET_NUMBER
599
Direction
E
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376-9100
APN
24614015
CURRENT_STATUS
01
SITE_LOCATION
599 E VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US ecology <br /> ER Daily Work Report <br /> Customer: Rite Aid#6490 Date: 10/11/2018 <br /> Project Location: 599 E.Valpico Rd.Tracy,CA 95376 Unit ID: 4020 <br /> Work Order#: 22773800 Job#: US000264 <br /> Description Of Daily Activities&Work Area <br /> Rite Aid#6490 is under a state audit and needs all non haz paint pails removed from the facility dumpster,labeled&packaged <br /> into 55G DMs,and staged on-site for future scheduled disposal. <br /> Job Safety Comments <br /> Remediation of miscellaneous chemicals,slips,trips,&falls.Working in small and cramped spaces.Working with sharp or broken <br /> Instructions received And/or Other Comments <br /> USE ERM in communication with Rite Aid Corporate and the vendor throughout the duration of this incident. <br /> Labor <br /> Name Position Rate ST Hrs. OT Hrs. Total <br /> Toryus Brantley ER Coordinator $ 90.00 4 $ 360.00 <br /> Annette Rivera Project Administrator $ 52.50 2 $ 105.00 <br /> Subtotal Labor: $ 465.00 <br /> Travel/per diem <br /> Description Qty Rate Units Total <br /> Subtotal per diem:1 $ <br /> Equipment <br /> Description Qty Rate Units Total <br /> Subtotal Equipment: $ <br /> Materials <br /> Description Qty Rate Units Total <br /> Subtotal Materials: $ <br /> Sub Contract Service/Labor <br /> Contractor Description Total <br /> Heritage Env. <br /> Subtotal Subcontract: $ <br /> Estimated Daily Total: $ 465.00 <br /> Page 3 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.