Laserfiche WebLink
State of California Water Resources Title 23 (Register #85.#33-&17- <br /> 85),Control Board Subchapter 16.Underground Tank <br /> Regulations;Article 3,Sections 2632 <br /> and 2634;Article 4,Section 2647 <br /> (October, 1986) <br /> Santa Clara Valley Water District Guidelines for Investigating Fuel <br /> Leaks (March, 1989) <br /> Santa Clara Valley Water Distnct Guidelines for Preparing or Reviewing <br /> Sampling Plans for Soil and <br /> Groundwater Investigation of Fuel <br /> Contamination Sites Qanuary, 1989) <br /> Alameda County Water District Groundwater Protection Program: <br /> Guidelines for Groundwater and Soil <br /> Investigations at Leaking <br /> Underground Fuel Tank Sites(most recent <br /> revision) <br /> American Public Health Standard Methods for the Examination <br /> Association of Water and Wastewaters, 16th <br /> Edition <br /> Analytical Chemistry (journal) Principles of Environmental Analysis <br /> Volume 55,pages 2212-18,December, <br /> 1983 <br />• American Petroleum Institute Groundwater Monitoring &Sample Bias <br /> Environmental Affairs Dept., <br /> June,1983 <br /> The Bay Area Air Quality Regulation 8-Rule 40&Rule 48 <br /> Management District <br /> Because groundwater samples collected by HETI are analyzed in the parts per billion (ppb) <br /> range for many analytes,care is exercised to prevent contamination of samples. When volatile <br /> or seinivolatile organic compounds are included for analysis,HETI sampling crew members will <br /> adhere to the following precautions in the field: <br /> 1 A new pair of clean,disposable,latex(or comparable material)gloves are to be worn for <br /> each well to be sampled. <br /> 2 When possible,samples will first be collected from wells known or suspected to contain the <br /> fewest contaminants,followed by wells in increasing order of degree of contamination. <br /> 3 All sample bottles and equipment are to be kept away from fuels and solvents. When <br /> possible,gasoline(used in generators and water pumps)is to be shipped to the project site in <br /> separate compartments of the same vehicle or in a separate vehicle as that in which <br /> sample bottles are shipped. <br /> 7 <br />