Laserfiche WebLink
• SITE SAFETY PLAN <br /> FOR <br /> CLIENT: <br /> SITE �l.a-T �1��.( �, .— Job No: . <br /> ADDRESS: <br /> SCOPE OF WORK (Check all that apply): <br /> Soil Excavation....................... Soil Stockpile Sampling................. <br /> (, <br /> .. <br /> Drilling ................................... Monitoring Well Sampling <br /> Testing System Installation <br /> Aquifer............................... 0 Ground Water............................ <br /> Vapor Extraction.............. ❑ Vapor Extraction......................... 0 <br /> AirSparging...................... 11 Aix Sparging................................. <br /> System Operation and Maintenance... 0 <br /> PURPOSE AND SCOPE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map - Figure 1) This SSP <br /> addresses the expected potential hazards that may be encountered during this project <br /> The provisions set-forth in this SSP will apply to Hydro-Environmental Technologies, <br /> Inc. (HETI) employees and any subcontractors working for HETI at the fob site All <br /> personnel working for HETI, including subcontractors, at the lob site must read this <br /> SSP, and sign the attached Compliance Agreement (Appendix A) before entering the <br /> work area. <br /> L FACILITY BACKGROUND/WORKPLAN <br /> SITE BACKGROUND AND HISTORY: <br /> In March 1990, four underground storage tanks (UST's) were removed from the site. <br /> Soil samples collected from beneath the former UST's and the former dispenser islands <br /> contained detectable concentrations of petroleum hydrocarbons. Based on these results, <br /> the San Joaquin County Environmental Health required a preliminary site assessment <br /> be performed <br /> In August 1991, Nachant Environmental, Inc (NEI) supervised the drilling of three soil <br /> borings (B-1, B-2 and B-3) to depths between 40 and 50 feet below grade Detectable <br />