Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
x <br /> Ms Linda Turkatte <br /> October 17, 1994 <br /> ' Page 3 <br /> Procedures for installing the dual completion well and conducting an AS/SVE pilot test are <br /> included in Attachment A <br /> Results of the pilot test will be summarized in a Corrective Action PIan (CAP) The CAP will <br /> _ include a summary of investigations conducted to date, descriptions of the subsurface geology <br /> and hydrogeology in the vicinity of the site, analytical results of soil and groundwater samples <br /> collected dunng past investigations, show the extent to which soil and groundwater have been <br /> 1 affected, present results of the pilot tests, and present conclusions and recommendations for <br /> remediation of the site <br /> ' Schedule <br /> Brown and Caldwell proposes to complete all field work within 90 days following approval of <br /> this work plan The Site Investigation Report will be submitted to the Contra Costa County <br /> Health Services Department within 60 days following the completion of the field work <br /> If you have any questions or require additional information, please call me at your earliest <br /> convenience at (510) 210-2278 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> Todd Miller <br /> Project Manager <br /> TIMI <br />' Attachment <br /> r <br /> e ersme\100966\workp1an <br /> hplaserIIID <br /> Brown and Caldwell <br /> _:-su;tants <br />