Laserfiche WebLink
I MONITORING WELL PURGING AND SAMPLING LOG <br />' <br /> Project Name f Pro,ed No <br /> f� 3 z5 w ooz$ <br /> rov�,et- C'�� Set�.ie 1 p <br /> Pro,ect Address/City/County 53 G.la�ev]o(� � STaGK-ks, <br /> SAMPLING IN <br /> Water Level Meter(Mod&&) S }r��q -rG_ hiterface Probe(Mod4nD) <br /> Water Quality MeterWoddllt]) �S-r 6; Decontamination Method 3-stage bz;cket (wash, tap rinse, Dl rinse) <br /> Purging Method PVC Bailer _Vacuum Truck Submersible Punk Other <br /> Sampling Method Teflon Basler Disposable Bailer Other <br /> s" BORE�,t�l ' t" <br /> Borehole Diameter(C'lrele) 8" 10" 12" Casing Diameter(Circle) 2" 4" 6" 12" 18" 24" <br /> Borehole Mt lfhpher(BM)(Banomhoat) 081 1 5 195 Casing Multiplier(CM)(gano,etmot) 0 065 147 587 132 235 <br /> G IRE 15,1 <br /> Depth to Free Product(feel) Borehole Volumes(BV) <br /> Depth to Water(DTW)(feet) 41 WC x BM - (BV)(pi) x 1 5 BV(Bat) <br /> Total Well Depth(fes) 33 Casing Volumes(CV) <br /> Water Coltnrm(WC)(feet) , S WC Z T.S�x CM C� _ S (CV)(Bat) x 3 0 CV(gat) ,7 2 <br /> Free Product 77udmess(feet) „� Free Product Purged(gallons) <br /> *Y <br /> rt,(, <br /> Cum Vol Purged EI Condudtvrty Dissolved Turbidity Odor <br /> Time DTW(ft) �o�) Temp('c) pH (u m mhos) OX3 P�(mss) (T11� (s'-dwo) <br /> 35 Purging Start Time 20,Z -7,30 � � "s A/0 <br /> �� b 2017- ` . o 5 v S N-a- <br /> f 7-0 l -- �, Z- 20, 3 1z Frl u f <br /> 7 <br /> 121-3 S�.s U 1 �. � 4 2� 13 15 <br /> 3 � Total Gallons Purged <br /> PP:urgingEndTamed Depth to Water @ Sample Tune(DTWs) S <br /> 1 <br /> Filtered Analytical Parameters <br /> Container Types,Volumes,&Quantities (Yew/no) Sample PreservaUvcs (cross-ut all NOT spphcable) <br /> x-40 mL VOAs N Ice and HCl TPHg / BTEX / MTBE / OXYs <br /> } <br /> r� <br /> Maxtmu n Drawdown(DTWm xfert) Approximate Flow Rate(GPM) <br /> Recovery <br /> (DTW-DTWm) <br /> %Recovery =1- BTW DTWs) X100 Calculation %Recovery =1 ( ) x 100 <br /> I Recovery Type _Fast _Slow %Recoveryire <br /> = <br /> ATC Representative(s) �- <br /> v. �u�rVi <br /> Subcontractor <br /> G- <br />