My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008575
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0008575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 4:45:53 PM
Creation date
7/15/2020 3:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008575
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IAll drill cuttings will be collected in Department of Transportation (DOT)-approved 55-gallon drums and <br /> . will remain on-site pending proper disposition Soil cuttings will be managed in accordance with SJC <br /> I guidelines If a boring is not completed as a well (for example, if unable to advance boring to <br /> groundwater), it will be backfilled through a tremie pipe with bentonite grout from total depth to <br /> approximately 1 foot bgs, and capped with concrete to the surface An ATC staff scientist will complete <br />' lithologic logs for each boring in general accordance with ASTM Method D 2488-90 Boring Log Notes, <br /> Method of Soil Classification, Soil Boring Graphics, and an edited boring log are included in Appendix B <br /> I5.4 Organic Vapor Monitoring <br /> To obtain preliminary data regarding the degree of potential petroleum hydrocarbon-impact to soil and for <br />' health and safety concerns, a representative sample will be collected at each soil sampling location and <br /> field screened for volatile organic vapors utilizing a hand held photo-ionization detector (PID) in general <br /> I accordance with ATC's Standard Operating Procedure - Field Soil Vapor Monitoring, which is included <br /> in Appendix A PID readings will be recorded in the boring logs <br /> 5.5 Well Installation <br /> Following completion of proposed borings MW-13 through MW-17, the borings will be completed as <br />' groundwater monitor wells The proposed construction of MW-13 through MW-17 will consist of 40 feet <br /> (surface to 40 feet bgs) of blank 2-mch, Schedule 40 PVC casing, and 25 feet of slotted (0 020-inch slots) <br /> 2-inch Schedule 40 PVC well screen To compensate for an observed historical increase in groundwater <br /> lie elevation observed in previous assessments and to provide a sufficient screened interval to include these <br /> wells as observation points during an aquifer pump test, the well screen will extend from approximately <br /> 10 feet above the static water level to approximately 15 feet below All well casing and screen will be <br /> delivered to the site in factory-sealed containers <br /> I The annulus of the screened portions of the monitor wells will be backfilled with a #3 Monterey sand (or <br /> equivalent) filter pack from approximately 39 to 65 feet bgs The filter material will then be settled by <br /> surging the well with a surge block Adding more sand prior to placement of the bentonite seal will <br /> compensate for any settlement A 2-foot layer of bentonite pellets will be placed on top of the upper filter <br /> pack and hydrated to form an annular seal from 37 to 39 feet bgs Bentonite grout will be placed from 2 <br /> to 37 feet bgs The well will be completed from 2 feet bgs to the ground surface with a watertight, flush- <br /> mounted, traffic-rated vault slightly raised for drainage and set in a 3-foot diameter concrete perimeter <br />' seal Construction details are illustrated in Figure 5 <br /> Following completion of boxings VEAS-1 through VEAS-3 the borings will be completed as a dual <br /> completion vapor extraction/air sparge wells The borings will be drilled to approximately 65 feet below <br /> ground surface The vapor extraction portion of the wells will be constructed of a 4-inch PVC casing <br /> screened from 15 to 50 feet (0 020-inch slots) The air sparge well will be constructed of a 1-inch <br /> EZ 100966SAFSWP ATC Associates Inc <br /> S 1EZ Serve\FZ 1009661Reports1100966SAFSWP ATC Project No 43 25827 0026 <br /> I 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.