The aquifer test will be conducted using a submersible Grundfos environmental pump which will have a <br /> check valve A discharge hose will be connected to the pump and extend to the sewer, or a holding tank A <br /> flow meter/totalizer will be installed to measure the flow rate and total gallons extracted during the test A <br /> globe valve will be utilized to control the extraction flow rate The pump will be set approximately one to <br /> two feet from the bottom of the well A generator, or existing electrical power at the site, will be used to <br /> power the pump Pressure transducers will be installed in the pumping well and in three observation wells <br /> The transducers will be connected to a data logger, which will document changes in the groundwater surface <br /> elevation as the test proceeds Traffic cones and caution tape will be used to surround the pumping well and <br /> associated test equipment The discharge hose and all power cords will be secured to the ground using duct <br /> tape <br /> iPrior to the start of work, a decontamination area will be established This will be in a secured area and <br /> consist of an Alconox solution wash, a first rinse and a second rinse Down hole equipment will be <br /> decontaminated prior to use Prior to equipment set-up, all wells to be monitored during the test will be <br /> opened and allowed to stabilize The data logger will be set-up for the conditions of the test <br /> At least 24 hours prior to the test, a step test will be performed to determine the appropriate flow rate to be <br /> used during the aquifer test The step test will be conducted in the well to be used for the aquifer test Each <br /> step will consist of pumping groundwater from the designated pumping well at a constant rate until the water <br /> level stabilizes The flow rate will be increased in each subsequent step until the maximum flow rate that <br /> can be sustained by the pumping well is determined <br /> 10 <br /> Prior to starting the pump, the total gallons displayed on the flow meter/totalizer will be recorded This will <br /> be used to determine the total number of gallons extracted during the test The pump and data logger will be <br /> turned on simultaneously to start the pumping test During the pumping test a constant flow rate will be <br /> extracted from the pumping well The flow rate and data collected by the data logger will be periodically <br /> monitored during the test The duration of the pumping test will be determined by the data collected The <br />' test may be conducted for 8 to 16 hours Personnel conducting the test will determine the duration of the <br /> pumping test <br /> Once the pumping test is completed, the pump as shut off and the recovery test begins Prior to shutting off <br /> the pump the data logger will be configured for the recovery portion of the aquifer test The exact time and <br /> the total gallons displayed on the flow meter/totalizer will also be recorded The pump will be turned off and <br /> data logger stepped to collected recovery data The duration of the recovery test will be determined by the <br /> data collected The recovery test may be conducted for 8 to 16 hours Personnel conducting the test will <br /> determine the duration of the recovery test <br /> An effluent water sample shall be collected during the pumping test The analytical data can be used to help <br />' design a groundwater remediation system Additional sampling may be required by conditions of a <br /> discharge permit If water is being stored in a holding tank, appropriate samples will be collected per <br /> disposal requirements The water will be removed to an appropriate disposal facility by a licensed <br /> transporter <br />' EZ 100966SAFSWP ATC Associates Inc <br /> S 1EZ Sme\EZ 1009661Reports1100966SAFSWP ATC Project No 43 25827 0026 <br /> 12 <br />