My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008575
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0008575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 4:45:53 PM
Creation date
7/15/2020 3:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008575
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • ATC shall have unrestricted site access and will not be limited to specific working hours <br /> • • The schedules do not include allowance for delays or standby time due to inclement weather, facility <br />' access restrictions or other factors beyond the control of ATC <br /> • Nothing contained within this workplan shall be construed or interpreted as requiring ATC to assume <br />' the status of a generator, transporter, storer, treater, or disposal facility as those terms appear within <br /> the Resource Conservation Recovery Act, 42 USCA, Section 6901 et_ . seg , as amended, or within any <br /> state statute governing the treatment, storage, and disposal of hazardous waste <br />' • ATC may recommend additional work or disposal activity This workplan does not include any work <br /> that may be recommended based on the results of this project ATC will provide a supplemental work <br />' plan for additional recommended assessment services <br />' 7.0 WORK SCHEDULE <br /> Following receipt of SJC approval of the workplan, ATC will seek pre-approval for the implementation of the <br /> workplan from the California Underground Storage Tank Cleanup Fund Upon receipt of pre-approval, ATC <br /> can initiate the project within 5 days ATC anticipates that site access negotiations and well permitting should <br /> take approximately 30 days, well installation, and development fieldwork should take approximately 5 days <br /> Pilot study fieldwork should take approximately 5 days Groundwater gauging and sampling should take 1 <br /> day Groundwater analytical test results should be received within 10 - 15 working days of sample delivery <br /> • Data interpretation and report preparation are expected to take 20- to 30-working days Subsequent <br /> groundwater monrtonng quarterly reports will be submitted by the 15'h day of the month following the end of <br /> the quarter The estimated project schedule does not include allowances for delays or standby time due to <br /> inclement weather, facility access problems or other factors beyond the control of ATC <br /> I <br /> i <br /> EZ 100966SAFSWP ATC Associates Inc <br /> S%EZ Sme\F-Z 1009661Reports\I 00966SAFSWP ATC Project No 43 25827 0026 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.