Laserfiche WebLink
1 <br /> TABLE OF CONTENTS(Continued) <br /> FIGURESFigure 1 Vicinity Map <br /> Figure 2 Previous Site Investigation Map—Soil Borings/Groundwater Monitor Wells (NE, August 1991, <br /> TPE, June/July 1992, HET, December 1993, BC, December 1994/Janaury 1995, Clearwater, <br /> June 200 1) <br /> Figure 3 Groundwater Summary Map(ATC,November 6, 200 1) <br /> Figure 4 Proposed Well(MW-13 through MW-17, EX-1 and VEAS-1 through VEAS-3) Location Map <br /> Figure 5 Proposed Groundwater Monitor Well (MW-13 through MW-17) Construction Detail <br /> Figure 6 Proposed Remediation Well(YEAS-1 through VEAS-3)Construction Detail <br />' Figure 7 Proposed Groundwater Extraction Well(EX-1)Construction Detail <br /> APPENDICES <br /> Appendix A Standard Operating Procedures-- <br /> Soil Borehole Drilling,Remediation Well Installation, and Soil Sampling <br /> Field Soil Vapor Monitoring <br /> LGroundwater Monitoring, Well Purging and Sampling <br /> Soil Vapor Extraction and Air Sparging Pilot Tests <br /> Constant Discharge Aquifer Test <br /> Appendix B Boring Log Notes <br /> Method of Soil Classification <br /> Representative Edited Boring Logs <br /> Groundwater Sampling Log <br /> Chain-of-Custody Record <br /> 1 <br /> EZ 100966SAFSWP ATC Associates Inc <br /> S 1EZ Servc\EZ 1009661Reports1100966SAFSWP ATC Project No 43 25827 0026 <br /> tt <br />