Laserfiche WebLink
�J <br /> IN <br /> } <br /> Delta <br /> A#///1, Consultants, <br /> Inc. <br /> Solving environment-related business ��problems worldwide V� , r�I� n <br /> rl,� www deltaenv com <br /> 3164 Gold Camp Drive •Suite 200 <br /> Rancho Cordova, California 95670 USA # 1 QQ <br /> 916 6382085 800 477 7411 ENVih0lJ%,iEN F FIEALTH <br /> Fax 9I6 63$8385 <br /> PER MIJ/ RVICES <br /> February 8, 2006 <br /> Harlin Knoll <br /> San Joaquin County <br /> Department of Environmental Health <br /> E Weber Avenue, 3rd Floor <br /> Stockton, CA 95202 <br /> Re Case Number# 1757 <br /> Quarterly Groundwater Monitoring Report, Fourth Quarter 2005 <br /> Former RPMS No 100966 <br /> 2537 Waterloo Road, Stockton, California <br /> Delta Project RPMSO-966 <br /> Dear Mr Knoll <br /> Delta Environmental Consultants, Inc (Delta) has been contracted by Restructure Petroleum Marketing <br /> Services of California (RPMS) to perform environmental services at the Former RPMS (E-Z Serve) Location <br /> 100966(Figure 1) <br /> The groundwater monitoring data discussed in this report was collected on December 29 and 30, 2005 The <br /> work was performed in accordance with the field methods and procedures included in Appendix A <br /> Groundwater Level Measurements <br /> On December 29 and 30, 2005, Delta personnel mobilized to the site to conduct groundwater monitoring <br /> activities The depth to groundwater was measured in twenty two monitoring wells (MW-1 through MW-18, <br /> MW-18D, VW-1, V W-2 and EX-1) The depth to groundwater ranged from 50 96 feet to 51 72 feet below the <br /> top of casing Groundwater elevation data collected on December 29 and 30, 2005, were used to create a <br /> groundwater elevation contour Map, in both the shallow wells (Figure 3) and the deep wells (Figure 4) The <br /> groundwater elevation data show the groundwater flow direction was to the west with a gradient of <br /> approximately 0 001 across the site Measured depths to groundwater and the calculated groundwater <br /> elevations are presented in Table 1 Measurements predating the first quarter of 2000 are presented in Table 2 <br /> Field data sheets for the fourth quarter sampling event are attached in Appendix B <br /> Groundwater Sampling and Analytical Results <br /> During the December 29 and 30, 2005 groundwater monitoring event, groundwater samples were collected <br /> from twenty two monitoring wells (MW-1 through MW-18, MW-18D, VW-1, VW-2 and EX-1) Prior to <br /> sampling, the monitoring wells were,_purged by removing approximately three well casing volumes of water <br /> `.' with a submersible pump Following purging, separate disposable polyurethane bailers were used to collect <br /> samples from each well Each groundwater sample was decanted into properly labeled, laboratory <br /> A member of 1 <br /> w Vpms cVworkmglproject files%100966 stockton 2577 waterloo roa&gwmN4 q 051rpms 0966 bwm 4th q05 doe X1n <br /> S <br /> — 1 <br />