Laserfiche WebLink
' Based on these findings, ATC recommends the following <br /> • Drill and install off-site groundwater monitor wells north newly installed groundwater monitor well <br /> MW-14, and southwest of newly installed groundwater monitor well MW-13, <br /> • Submit a Corrective Action Plan based on feasibility testing which was conducted in December 2002, <br />' - Continue quarterly groundwater sampling of all site wells not containing measurable PSH <br /> 70 LEMdTATIONS <br /> The discussions and recommendations contained in this report represent the professional opinions of ATC <br /> These opinions are based on analysis and interpretation of currently available information All work has been <br /> performed in accordance with generally accepted practices among geotechnical/environmental engineering, <br /> engineering geology and hydrogeology consulting firms at this time and location No other warranty, either <br /> expressed or implied, is made <br /> 8.0 REFERNCES <br /> ATC, 2002 Groundwater Monitoring Report (4" Quarter 2002) dated January 23, 2003 <br />' ATC, 2001 Workplan for Additional Assessment, Remediation Well Installation and Feasibility Studies, dated <br /> December 21, 2001 <br /> 1 <br /> EZ 100966ASAR rpt ATC Associates Inc <br />' 11San DregolEZ Serve11009661Reports1100966SAR001 rpt ATC Project No 43 25827 0026 <br /> 14 <br />