Laserfiche WebLink
MONITORING WELL <br /> t10 CONSTRUCTION DETAILS <br /> PROJECT NO 19011.05 MONITORING WELL NO . MW-1 <br /> LOCATION. Beacon #419 <br /> 2350 Waterloo Road ELEVATION' 21.11 feet <br /> Stockton, California <br />' Protective Casing <br /> Loddng Water Tight Cap <br /> Hugh Grade Web Contraction <br /> Diameter and MaVI 12—inch steel <br /> Total length 12 Inches <br /> Length Above Ground 1/4 inch <br /> Thickness and Type of Seal 2 feet, concrete <br /> Diameter, McVI and 4 Inch, SCH 40 PVC, <br /> Joint Type of Riser Prpe flush thread <br /> r <br /> J Type of Backfill cement/ 5% <br /> Around Riser bentonite grout <br />' Thickness and Type 2 feet <br /> of Seal bentonite chips <br /> 'R Distance of Filter Sand 2 feet <br /> Above Top of Screen <br /> Type of Filter #3 ionestar <br /> Around Screen <br /> Mandonng Well Mat'I SCH 40 PVC <br />' Screen Gauge/Slot Size d 020 inch <br /> J <br /> Diameter and Length 4 inch, 20 feet <br /> of Screen <br />' Depth to Bottom 85 feet <br /> of Monitoring Well <br /> pepth to the Bottom 8$ feet <br /> of F.Iter Sand <br /> De th to the Bottom 95 feet <br /> of to <br /> 10 in <br /> MONITORING WELL WATER LEVEL. MEASUREMENTS <br /> L1 = 0.5 feet Date; Time Water Level* <br /> L2 = 64 5 feet <br /> L3 — 20 00 feet 7/8/94 100 69.98 ft. <br /> L4 = 95 00 feet <br /> Completion Date and Time: 7/6/94 0915 * Measunng Point Top Of Casing <br /> ACTON • MICKELSON VAN DAM, f NC <br /> 4511 Golden Foothill Parkway, #1 <br /> EI Dorado Hills, CA 95762 <br />