Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
' TABLE OF CONTENTS (Continued) <br /> • <br /> FIGURES <br /> Figure 1 Vicinity Map <br /> Figure 2 Previous Site Investigation Map—Soil Bonngs/Groundwater Monitor Wells (NE, August 1991, <br /> TPE, June/July 1992, HET, December 1993, BC, December 1994/January 1995, Clearwater, <br /> June, 2001) <br /> Figure 3 Groundwater Summary Map(November 20, 2002) <br /> Figure 4 Site Plan with Geologic Cross-Section Lines <br /> Figure 5 Groundwater Monitor Well(MW-13 through MW-17)Construction Detail <br /> Figure 6 Groundwater Extraction Well (EX-1) Construction Detail <br /> Figure 7 Remediation Wells(YEAS-1 and VEAS-3) Construction Detail <br /> Figure 8 Remediation Well (VEAS-2) Construction Detail <br /> Figure 9 Groundwater Summary Map(ATC,January 16, 2003) <br /> Fig-tire 10 Geologic Cross Sections A-A' and B-B' <br /> Figure 11 Vicinity Map Showing Sensitive Receptor Search Area <br /> APPENDICES <br /> Appendix A Regulatory Agency Correspondence-- <br /> San Joaquin County, Environmental Health Department Work Plan Approval letter Received by <br /> ATC on May 22, 2002 <br /> Appendix B Permits-- <br /> San Joaquin County Public Health Services, Approved Well Permits <br /> Appendix C Standard Operating Procedures-- <br /> Soil Borehole Drilling,Monitor Well Installation And Development,And Soil Sampling <br /> Field Soil Vapor Monitoring <br />' Groundwater Monitoring And Sampling Procedures <br /> Appendix D Survey Data <br /> Boring Logs and Boring Log Notes <br /> Groundwater Sampling Logs <br /> Appendix E Waste Disposal Manifest <br /> Appendix F Laboratory Reports and Chain-of-Custody Documentation <br /> Appendix G DWR Water Well Drillers Reports <br /> EZ 100966ASAR rpt ATC Associates Inc <br />' 11San DFegoTZ Serve\]009661Reports1100966SAROO1 rpt ATC Project No 43 25827 0026 <br /> 11 <br />