Laserfiche WebLink
�j II II <br /> li <br /> II <br /> FORMER PRODUCT <br /> P� \ <br /> FUEL STORAGE <br /> .� iI TANKS <br /> DISPENSER � <br /> �- SB-6 <br /> J SB— \ ONCRETE <br /> PRODUCT LINES <br /> SB-3 <br /> O � S8-5r <br /> SB-4 �. <br /> FORMER L <br /> FUEL <br /> �._ <br /> DISPENSER STATION BUILDING �• <br /> 'P E <br /> i <br /> 2 i i• <br /> •. p <br /> '� II <br /> NORTH <br /> it APPROXIMATE SCALE (ft) <br /> III <br /> 0 30 <br /> NOTE: FUEL DISPENSER SYSTEMS WERE REMOVED IN OCTOBER 1993 y <br /> If <br /> �l <br /> r <br />'I 7[ iFIGURE 6 <br /> LEGEND: SITE MAP WITH PROPOSED SOIL BORING LOCATIONS <br /> BEACON STATION #610 <br /> 3300 WATERLOO ROAD <br /> FENCE Ip STOCKTON, CA <br /> Project No. Drawn 1 <br /> 19042.01 LmC Acton • Mickelson . van Dam, Inc. <br /> O CONDUCTOR CASING/PROPOSED 501E Consulting Scientists, Engineers, and Geologists <br /> File No. Prepared <br /> BORING LOCATION 19042F5N JEM 3/14/94 4511 Golden Foothill Parkway, Suite 1 <br /> • PROPOSED SOIL BORING LOCATION Revision Reviewed, EI Dorado Hills, California 95762 <br /> I� (916) 939--7550 <br />