Laserfiche WebLink
Mr. Kenneth Earnest <br /> 3 May 18, 1994 <br /> Page 4 <br /> fR <br /> Results Report <br /> k. After field activities are complete and after receipt of laboratory reports, a report of the results <br /> ` will be prepared to document field activities, and present the analytical results. The report will <br /> include soil boring logs, soil sample analytical results, vadose well construction detail forms, <br /> and subsurface soil descriptions. IR <br /> Schedule �! <br /> J <br /> AMV will proceed with work outlined in this plan as soon-as approval is obtained. A drilling <br /> crew will be mobilized to drill the proposed soil borings within 2 weeks of plan approval and <br /> receipt of applicable permits. Analytical results are generally available 2 weeks after completion <br /> of field activities. After receipt of analytical data, AMV will compile other site data and prepare <br /> a report summarizing our findings. The report will include soil sample analytical results and <br /> +` recommendations for additional investigation work, if warranted, or.no further action. <br /> We recommend that a copy of this work plan be-submittedito: <br /> I� <br /> M <br /> Ms. Mary Meays <br /> Environmental Health Department <br /> County of San Joaquin <br /> 445 North San Joaquin Street <br /> P.O. Box 388 <br /> i' Stockton, California 95201-0388 <br /> j� <br /> { Ms. Elizabeth Thayer <br /> California Regional Water Quality <br /> Control Board, Central Valley Regio <br /> 3443 Routier Road <br /> Sacramento, California 95827-3098 <br /> I� <br /> I i <br /> .a <br /> .r <br /> t ACTON • <br /> MICKELSON- <br /> I LRYWOS MAF <br /> van DAM,INC. <br /> Consulting Scientists,Engineers,and Geologists <br /> iI 1 <br />