My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008469
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
3500 - Local Oversight Program
>
PR0545858
>
ARCHIVED REPORTS_XR0008469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:23:15 PM
Creation date
7/15/2020 3:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008469
RECORD_ID
PR0545858
PE
3528
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> 1.0 INTRODUCTION <br /> This plan describes the health and safety procedures for the activities planned for the investigation at <br /> the Ultramar Inc Beacon Cardlock Station Number 610, located at 3300 Waterloo Road in Stockton, <br /> California All SSB Environmental Consultants, Inc, employees and field personnel will abide by this <br /> plan It is intended that all project work will comply with applicable codes and regulations of the <br /> United States Occupational Safety and Health Administration Each field team member working on this <br /> project will have the general responsibility to identify and correct any health and safety hazards and <br /> strive to make the work place safe. <br /> 1.1 Project Description <br /> This project is the investigation to be performed b SS <br /> g p y B Environmental Consultants, Inc, at the <br /> previously-mentioned project site The scope of the project will include the drilling of exploratory soil <br /> borings, the installation of monitoring wells, and the sampling of soils, groundwater, and vapors on and <br /> surrounding the subject property Sample labeling, preparation, shipment, and analyses will also be <br />' performed <br /> 1.2 Key Personnel & Responsibilities <br />' The following personnel who will have the overall responsibility for the safe operation of this <br /> investigation are <br /> David A. Sholes Principal <br /> Ronald Garrett Staff Geologist <br /> It is the responsibility of the above-designated safety officers to <br /> • <br /> Implement the site safety training program for all project field team members as described in <br /> this document <br /> Assure that all field personnel have read and understand this Health and Safety Plan <br /> - Establish effective traffic and pedestrian control around the drilling site <br />' Insure that adequate drilling site security is maintained <br /> • Perform work place surveillance for flammable/explosive conditions and insure that there is a <br /> portable fire extinguisher located on-site <br />
The URL can be used to link to this page
Your browser does not support the video tag.