My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
7/16/2020 8:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 4 of 6) <br /> bill, MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring . Y N NA <br /> Are the visual and audible alarms operational ? r r r <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats �— <br /> move freely , functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not r r <br /> interfere with their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? r r r <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational ? r r <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? r r r <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is r- <br /> electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? r r- r <br /> Which sensors initiate positive shut down? Check all that apply ,) Sump F Under4s enser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . g . modem) operational? r r <br /> For any answer of "N " above, describe in section IX how and when these deficiencies were or will be corrected. <br /> IX COMMENTS <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> X. IN -TANK GAUGING TESTING <br /> r Check this box if tank gauging is used only for inventory control . (Do not complete this section.) <br /> r Check this box if NO tank gauging equipment is installed . (Do not complete this section .) Y ' N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including r- r- r <br /> testing for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, �— <br /> functionally tested , and confirmed operational ? <br /> Was accuracy of system's product level readings tested? r <br /> Was accuracy of system' s water level readings tested? r r <br /> Were all probes reinstalled properly? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? r r r <br /> For any answer of "N " above, describe in section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> Y = Yes , N = No , NA = Not Applicable <br /> I <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.