Laserfiche WebLink
� CCiRS UST Spilt Bucket <br /> SOLUTIONS DELIVEREDlzwa�� Integrity Testing Form <br /> Underground Storage Tanks ( UST) Program <br /> Instructions on Page 3 <br /> Purpose : This procedure is to test the leak integrity of single - and double -walled spill buckets . See reverse side for <br /> basic hydrostatic testing instructions . Consult PEI/RP1200 , Section 6 . 2 for hydrostatic test method , Section 6 .3 for <br /> single -walled vacuum test method , and Section 6 .4 for double -walled vacuum test method . <br /> Testing Information <br /> 1 . Tank number T1 :Diesel <br /> 2 . Product stored Diesel <br /> 3 . Spill bucket capacity 5 Gallons <br /> 4, Manufacturer OPW <br /> N Single-walled ❑ Single-walled ❑ Single-walled ❑ Single -walled ❑ Single-walled ❑ Single-walled <br /> 5. Construction ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> N Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic <br /> ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum <br /> ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled <br /> 6 . Testtype ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> X Product ❑ Product ❑ Product ❑ Product ❑ Product ❑ Product <br /> 7. Spill bucket type ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor <br /> 8. Liquid and debris <br /> removed from spill <br /> bucket:* 3 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 9. Visual inspection <br /> (No cracks, loose parts or <br /> separation of the bucket <br /> from the fill pipe,) ? 9 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 10. Tank riser cap included in <br /> test? 3 Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 11 . Is drain valve included in <br /> test? E Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 12. Starting level 13.00" <br /> 13 . Test start time 1 :20pm <br /> 14. Ending level 13.00" <br /> 15. Test end time 2:20pm <br /> 16. Test period 1 hour <br /> 17. Level Chan e 0 <br /> Test results : p Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pass/fail criteria: Must pass visual inspection . Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only; <br /> Maintain at least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br /> Comments : <br /> * All liquids and debris must be disposed of properly. <br /> Testing company CGRS Garrett Warren <br /> name : w! ° Testers name : <br /> Date : 1 - 17-2020 Tester's signature : < •. �� ,IF <br /> IF <br /> I fir <br /> S9 v E' <br /> F tb 2020 <br /> trinr nNi�''iE rAL HCa�LT <br /> ,p <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/PressureMydrostatic, ID = Identification <br />