My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:28:05 AM
Creation date
7/16/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XVI. LINE LEAK DETECTOR TESTING <br /> r Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? I✓ r F <br /> Check all that apply.) Simulated leak rate verified: Fv1- 3 GPH r 1.1 GPH r 0.2 GPH <br /> Was the testing apparatus properly calibrated? r r r <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? r r r <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? r r r <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? F70 r r <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? I✓ r r <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? 140 r r <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed? r r r <br /> Were all LLDs confirmed operational within regulatory requirements? r r r <br /> For any answer of"N"above, describe in section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> WO Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type Mark all that apply.) f Vacuum r Pressure 7 Hydrostatic <br /> Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> F Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> How was interstitial communication verified? r Simulated leak at far ends of the interstitial space. r Visual Inspection <br /> r Other Describe the method in section XV below. r Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason in section XV below.) <br /> For any answer of"N"above, describe in section XIII how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH =Gallons per hour, Y=Yes, N = No, NA= Not applicable, VPH =Vacuum/Pressure/Hydrostatic, ID =Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.