My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:28:05 AM
Creation date
7/16/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure ��.� IMPORTANT:Remove a II chips and shavings gener- <br /> a' 1 ated in steps 3 thru 5 out of the cut end of the tube. DO <br /> NOT remove chips and shavings by dumping thru valve <br /> r body. <br /> Mark Upper Tube <br /> STEP 4: FILE"THE UPPER DROP TUBE <br /> (tut Line) <br /> File the upper tube square,and remove any burrs or <br /> Seam <br /> Figure 2 rough edges. Make sure the cut is flat and square_ <br /> IMPORTANT:Carefully filea good chamfer on the <br /> STEP 3: CUT THE UPPER DROP TUBE inside edge of the drop tube to provide a lead-in for the <br /> polypak seal and inlet tube installed in Step 8. <br /> Attach the supplied band clamp to the upper tube just <br /> below the mark and ensure that it is assembled square <br /> to the tube. The damp can be used as a guide for mak- <br /> ing a square cut. If a vise is used,clamp on the valve <br /> body casting only to avoid damage to the float and <br /> tubes(See Figure 3A), Carefully saw through the tube <br /> squarely,at the mark made in Step 2. Use a hacksaw <br /> with a new fine-tooth blade. Rotating the upper tube <br /> as the sawing progresses will minimize run out and en- <br /> sure a square 9(}-degree cut. Remove the band clamp <br /> after tube is cut. <br /> CAUTION-DO NOT use a pipe or tubing cutter to cut Fine half round file <br /> the upper drop tube,this may damage the tube, <br /> causing it to be out of round thereby prohibiting <br /> assembly of the unit. <br /> Figure 4 <br /> \� <br /> STEP S: SAND THE UPPER DROP TUBE <br /> �..; Sand the inside of the drop tube with sandpaper and/or <br /> \ steel wool to remove all burrs and sharp edges. After <br /> sanding wipe down the inside of the tube with a clean <br /> J rag from the top to approximately 4 inches down to <br /> remove any debris. <br /> _ 4- '- tion: Failure to property chamfer,sand,and <br /> �/ l��' clean the drop tube may cut the seal and result in a <br /> r{J failure of a pressure decay leak test. <br /> Figure 3A <br /> Band Clamp <br /> \ Fine grit sandr)aper <br /> t <br /> Cut Lina Figure S <br /> Figure 39 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.