My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:28:05 AM
Creation date
7/16/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREVENTATIVE MAINTENANCE cations. Performance Requirement: Leak rate to be less <br /> Annually,inspect the flapper in the 71 SO to see that it is than or equal to 0.17 CFH@2.0"W.C. <br /> open by looking down the drop tube opening. Test the <br /> 71 SO drop tube seals with CARE procedure TP-201.1 D. Torque Specification <br /> If the drop tube seal passes testing, no further mainte- Taptite Screws,#10-24 thread cutting,20 in-lbs mini- <br /> nance is required. If the drop tube fails testing,replace mum to 35 in-lbs maximum. Testable Models Only. <br /> the drop tube seal with OPW P/N:H11931 M for 4" Socket Adaptor, 1/4"NPT,3.5 ft-lbs(42 in-lbs)minimum <br /> Tubes. Re-test the 7150 drop tube with GARB proce- to 5.0 ft-!bs(60 in-lbs)maximum. <br /> dure TP-201.1 D. The lower tube o-ring seal OPW P/N: <br /> H14840M can also be replaced. 1f this does not correct IMPORTANT: Leave these installation instructions <br /> the leak the 71 SO needs to be replaced. and maintenancerocedures with the station <br /> p opera- <br /> FOR TESTABLE MODELS ONLY. The socket adaptor .to r. <br /> can be removed and poppet and float movement and <br /> function inspected without removing the valve. See <br /> Page 17 for full testing details. If replacement parts are <br /> needed for testable models the following items are <br /> available: OPW P/N 206741 Testable Inlet Tube S/A, <br /> 206740 Socket Adaptor and Cable Assembly,and 61 SOK <br /> AQ01 Float Kit. <br /> CAUTION: Do not insert any foreign object into drop <br /> tube if flapper is in the closed position. For exam- <br /> ple,a tank level measuring stick. This will damage <br /> the valve and void the Warranty. ALWAYS check <br /> flapper location before"sticking"the tank. If flap- <br /> per Is in the closed position,the tank is either over- <br /> filled and you need to wait until the liquid level goes <br /> down or the 71SO Is damaged and needs to be re- <br /> 71 SO Performance Specifications <br /> This Overfill Prevention Valve has been manufactured <br /> and tested to,and met,the following California specifi- <br /> cs <br />
The URL can be used to link to this page
Your browser does not support the video tag.