My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 8:57:35 AM
Creation date
7/16/2020 12:32:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> /f you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following <br /> equipment, if installed: 1) monitoring system control panels;2) in-tank liquid level probes(if used for leak detection);3) devices <br /> monitoring tank annular spaces or vault;4) devices monitoring product piping;5)devices monitoring fill piping;6) devices monitoring vent <br /> piping; 7)devices monitoring vapor recovery piping;8)devices monitoring vent/transition sumps;9)devices monitoring under-dispenser <br /> containment; 10 line leak detectors;and 11 devices monitoring any other secondary containment areas. <br /> RECEIVED <br /> JAN 21 2020 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> HOLMAN RD <br /> DUMP- <br /> STER VR/BR/INCON <br /> MCDONALDS C-STORE <br /> * SENSORS <br /> XESO <br /> xEse <br /> J <br /> � m N <br /> �p ro Li <br /> L3 <br /> SUP <br /> 1 <br /> L 4Z <1Z <br /> • (2) L4 <br /> AIR/ <br /> H2O <br /> VENT REG <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.