Laserfiche WebLink
W.O.# NW1-2345149 Cust Ref#: COCO-0015328444 <br /> r <br /> Site Number: <br /> Date: <br /> Instructions: <br /> Orlenlation of the Drop Tube must he documented any trmn It is pulled for tetiunf;i,-,r r(-platr•mant <br /> Step Instructlons <br /> Tl 12 T3 14 <br /> 1 Tank ID&product product <br /> ldenhfr the 10,7411101)of the ATG m rplahnn to lfw fill - --- -- --- <br /> 1 location of the ATG on the Tank lvtap below Use spparrtc sheets for �I <br /> multiple tank configurations <br /> Was Drop Tube it drop tube was rpolarat6 is the 111411 side,of the ugte i ut <br /> 3 <br /> Replaced? m 180 degrees frathe location of thr flapper tit a,nnflindn, 1)J U N J <br /> 041,1� <br /> Clea:-up of Overfill valve showing upper&lawn, / / <br /> connections �J (¢P <br /> Fnu,e drop tube-showing orientation of overfill valve <br /> 4 Photos vs anglecut <br /> Orientation of Fill in relation to other nsers <br /> Looking down the rill tube,%hawing indentannn of <br /> overfill valve <br /> Sample Photos: <br /> FI p \. <br /> %0 <br /> Angle Cut Orientation: <br /> Flapper or float fligh side of angle cut Is 180 deg <br /> [opposite)the flappet/llor <br /> ~' high side of angle cut <br /> Map Tank Top Equipment: <br /> von <br /> sag irao <br /> {enterl�ne <br /> .✓ O O O ,� <br /> matwny <br /> 4?O <br /> ()top Tube Orwllation 8 <br /> v! <br /> I <br /> Drop tube verification check Ftts 10 2020 <br /> ENVIRONMENTAL HEALTH <br /> DF A.RTMENT <br />